Demonstration site. The City of Cedar Harbor is fictional. Nothing here is a real service, meeting or record. How This Site Is Built

  • Notice: Holiday week: trash and recycling pickup is 1 day later

    City offices are closed for the holiday and there is no pickup that day. If your pickup day is the holiday or comes after it, put your carts out 1 day later than usual.

    See the holiday trash schedule

Apply for a building permit

Apply on the permit portal

This takes you to example.com, a service run by another organization. Its own privacy policy applies there.

Provided by Community Development Last updated

A building permit is the city’s approval to start construction. Homeowners, business owners and contractors can apply.

Find out if you need a permit

You need a permit to:

  • build a new building or an addition
  • build a deck more than 30 inches off the ground
  • move walls, plumbing or wiring
  • replace a roof, a water heater or a furnace

You do not need a permit to:

  • paint, lay flooring or replace cabinets
  • build a fence up to 6 feet tall
  • put up a shed of up to 120 square feet

Not sure? Call 555 555 0150.

Before you start

  • The address of the property.
  • A short description of the work and what it will cost, counting labor and materials.
  • A site plan that shows the property lines and how far the work is from them.
  • Floor plans, plus structural details for a deck, an addition or a new building.
  • Your contractor’s name and state contractor license number. If you are doing the work on your own home, you sign an owner builder statement.
  • Written permission from the property owner if that is not you.

Save each drawing as a PDF file.

What to do

  1. Ask a planner about your lot before you pay for drawings. Rules on height, distance from property lines and the shoreline can change your design.
  2. Prepare your drawings and save them as PDF files.
  3. Create an account on the city’s permit portal. An outside company runs it for the city.
  4. Fill in the application and upload your drawings.
  5. Pay the plan review fee.
  6. Answer the reviewer’s comments. We email you if a drawing needs a change.
  7. Pay the permit fee when we approve your plans.
  8. Download your permit and your approved plans.
  9. Post the permit where it can be seen from the street, and keep the approved plans at the site.
  10. Request an inspection at each stage, before you cover the work. Use the portal or call 555 555 0155.
  11. Pass the final inspection. Your project is not complete until you do.

Cost

What you pay forFee
Permit for work that costs up to $5,000$95
Permit for work that costs $5,001 to $25,000$240
Permit for work that costs $25,001 to $100,000$620
Permit for work that costs more than $100,000$620 plus $5 for each $1,000 over $100,000
Plan review, paid when you applyHalf of the permit fee
Water heater, furnace or roof replacement$65, with no plan review
Repeat inspection after a failed inspection$75
Building permit fees. The permit fee depends on what the work will cost.

A card payment has a service fee of 2.5%. The card processor keeps that fee. The city does not. Paying from a bank account is free.

Keep in mind

If you start work without a permit, the permit fee is doubled. A permit expires if 180 days pass without a passed inspection.

How long it takes

We aim to finish the first review of a home project within 10 business days and of a commercial project within 20 business days. A permit to replace a water heater, a furnace or a roof is issued as soon as you pay.

Other ways to apply

In person

Bring 2 printed sets of your drawings to the permit counter on the second floor of City Hall, 100 Harborfront Way. The counter is open Monday to Friday, 8 a.m. to 4 p.m. Staff can help you fill in the application.

By phone or email

We cannot take an application by phone, but we can answer questions. Call 555 555 0150 or email permits@cedarharbor.example.

What happens next

You can follow each step of the review on the permit portal. Call 555 555 0155 by 3 p.m. to have an inspector visit on the next business day.